    Dry Lead Acid Battery (500 Numbers Per Day)

    Dry Lead Acid Battery (500 Numbers Per Day)
    Dry Lead Acid Battery (500 Numbers Per Day)
    ₹ 0 INR
      Why Choose Us
      • More than 40 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.

      DRY LEAD ACID BATTERY

      [EIRI/EDPR/4522] J.C.: 2739INR,2739US$


      Lead Acid Storage Batteries is an electro-chemical system that converts electrical energy into direct current electricity. It is also known as storage batteries and has wide applications in Automobiles, UPS/Inverters, Traction/Electrical Sub-Station, Telecommunication, Solar Photovoltaic system etc.

      Working Principle of Lead Acid Battery

      The storage battery or secondary battery is such battery where electrical energy can be stored as chemical energy and this chemical energy is then converted to electrical energy as when required. The conversion of electrical energy into chemical energy by applying external electrical source is known as charging of battery. Whereas conversion of chemical energy into electrical energy for supplying the external load is known as discharging of secondary battery. During charging of battery, current is passed through it which causes some chemical changes inside the battery. This chemical changes absorb energy during their formation.

      When the battery is connected to the external load, the chemical changes take place in reverse direction, during which the absorbed energy is released as electrical energy and supplied to the load. Now we will try to understand principle working of lead acid battery and for that we will first discuss about lead acid battery which is very commonly used as storage battery or secondary battery.


      COST ESTIMATION

      Plant Capacity            500 Nos/Day  

      Land & Building (8000 sq.mt.)    Rs. 4.62 Cr    

      Plant & Machinery                    Rs. 2.50 Cr 

      Working Capital for 1 Month    Rs. 7.00 Cr 

      Total Capital Investment          Rs. 14.42 Cr 

      Rate of Return                          25%

      Break Even Point                      58%


      CONTENTS

      INTRODUCTION

      WORKING PRINCIPLE OF LEAD ACID BATTERY

      TYPES OF LEAD ACID BATTERY

      CONSTRUCTION AND COMPONENTS OF DRY LEAD ACID BATTERY

      CONSTRUCTION

      LEAD ACID BATTERY DIAGRAM

      CONTAINER

      PLATES

      ACTIVE COMPONENT

      SEPARATORS

      BATTERY EDGES

      DIFFERENCES BETWEEN FLAT PLATE AND TUBULAR LEAD ACID BATTERY

      THE FLAT PASTED PLATE

      TUBULAR PLATE

      BATTERIES MADE FROM TUBULAR PLATES HAVE THE FOLLOWING CHARACTERISTICS:

      MERITS OF VENTED BATTERY

      DEMERITS OF VENTED BATTERY

      APPLICATIONS:-

      2. SEALED LEAD-ACID BATTERIES

      THERE ARE TWO TYPES OF SEALED LEAD ACID BATTERY

      MERITS SEALED LEAD ACID BATTERY

      DOES NOT REQUIRE WATER TOP-UP THROUGHOUT ITS LIFE

      DEMERITS OF LEAD BATTERY

      APPLICATIONS OF VALVE-REGULATED BATTERIES

      USES AND APPLICATION

      B.I.S. SPECIFICATION

      GLOBAL MARKET OF LEAD ACID BATTERY

      MANUFACTURERS/SUPPLIERS OF LEAD ACID BATTERY

      PAKISTAN BATTERY MARKET

      LITHIUM-ION BATTERY EXPECTED TO WITNESS SIGNIFICANT GROWTH

      STEPS IN BATTERY MANUFACTURING PROCESS

      BATTERY INNER STRUCTURE

      MAIN PARTS OF THE BATTERY

      MANUFACTURING STEPS OF LEAD-ACID BATTERIES

      1. OXIDE AND GRID PRODUCTION PROCESS

      GRID CASTING PROCESS

      2. PASTING AND CURING

      BATTERY PLATES AFTER PASTING AND CURING

      3. ASSEMBLING THE ELEMENTS

      BATTERY PLATES STACKING

      ASSEMBLING THE ELEMENTS OF BATTERY

      4. FILLING AND FORMATION

      MANUFACTURING PROCESS IN DETAILS

      LIST OF RAW MATERIAL

      THERE ARE FOLLOWING STEAPS ARE USED FOR MANUFACTURING LEAD ACID BATTERY

      (1) MANUFACTURING PLASTIC CONTAINER AND COVER

      MANUFACTURING PROCESS OF PVC/ABS BATTERY CONTAINER

      PLATE PREPARATION

      THE FLAT PASTED PLATE

      TUBULAR PLATE

      MANUFACTURING PROCESS OF TUBULAR PLATES

      MANUFACTURING PROCESS OF FLAT PLATE

      (A) LEAD OXIDE PREPARATION

      PROCESS:

      THE FOLLOWING ARE TESTED TO EVALUATE THE QUALITY OF LEADY OXIDE

      (B) GRID CASTING:

      TYPES OF GRIDS:

      COMMON DEFECTS IN GRIDS

      TESTING OF GRIDS:

      BEND TEST:

      BUS BAR CASTING:

      (C) PASTE PREPARATION

      FOR POSITIVE PASTE:

      FOR NEGATIVE PASTE:

      PASTING PROCESS

      (D) CURING AND DRYING:

      CURING AND DRYING IS DONE AT THREE STAGES.

      (3) ASSEMBLY

      A. GROUP STACKING:

      B. GROUP BURNING:

      C. GROUP STRAPPING:

      D. GROUP INSERTION:

      E. HEAT SEALING:

      F. POST BURNING:

      G. LEAK TESTING:

      (4). FORMATION

      A. CELL PACKING:

      B. ACID FILLING:

      (5) TESTING OF BATTERY

      (A) STATIC BATTERY VOLTAGE TEST

      (B) STARTING LOAD TEST

      (C) CHARGING SYSTEM TEST

      (D) AIR LEAKAGE TESTING:

      THERE ARE THREE TYPES OF AIR LEAKAGE SYSTEMS AVAILABLE MAINLY:

      MANOMETER IS VERY OLD TECHNOLOGY & THIS CANNOT BE USED FOR FAST OPERATION

      AIR TESTER

      6. FINISHING & DESPATCHING:

      PROCESS FLOW CHART

      PRINCIPLES OF PLANT LAYOUT

      STORAGE LAYOUT:

      EQUIPMENT LAYOUT:

      SAFETY:

      PLANT EXPANSION:

      FLOOR SPACE:

      UTILITIES SERVICING:

      BUILDING:

      MATERIAL-HANDLING EQUIPMENT:

      RAILROADS AND ROADS:

      MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:

      PLANT LOCATION FACTORS

      PRIMARY FACTORS

      1. RAW-MATERIAL SUPPLY:

      2. MARKETS:

      3. POWER AND FUEL SUPPLY:

      4. WATER SUPPLY:

      5. CLIMATE:

      SPECIFIC FACTORS

      6. TRANSPORTATION:

      A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES

      7. WASTE DISPOSAL:

      8. LABOR:

      9. REGULATORY LAWS:

      10. TAXES:

      11. SITE CHARACTERISTICS:

      12. COMMUNITY FACTORS:

      13. VULNERABILITY TO WARTIME ATTACK:

      14. FLOOD AND FIRE CONTROL:

      EXPLANATION OF TERMS USED IN THE PROJECT REPORT

      1. DEPRECIATION:

      2. FIXED ASSETS:

      3. WORKING CAPITAL:

      4. BREAK-EVEN POINT:

      5. OTHER FIXED EXPENSES:

      6. MARGIN MONEY:

      7. TOTAL LOAD:

      8. LAND AREA/MAN POWER RATIO:

      PROJECT IMPLEMENTATION SCHEDULES

      INTRODUCTION

      PROJECT HANDLING

      PROJECT SCHEDULING

      PROJECT CONSTRUCTION SCHEDULE

      TIME SCHEDULE

      SUPPLIERS OF PLANT AND MACHINERY

      SUPPLIERS OF EOT CRANES

      SUPPLIERS OF DG SETS

      SUPPLIERS OF POWER TRANSFORMERS

      SUPPLIERS OF COOLING TOWER

      SUPPLIERS OF ETP PLANTS

      SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS

      SUPPLIERS OF AIR CONDITIONING EQUIPMENTS

      SUPPLIERS OF AIR COMPRESSURE

      SUPPLIERS OF PLATEFARM WEIGHING MACHINE

      SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS

      SUPPLIERS OF FIRE FIGHTING EQUIPMENTS

      SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS

      SUPPLIERS OF RAW MATERIAL

      SUPPLIERS OF ANTIMONIAL LEAD

      SUPPLIERS OF LEAD OXIDE

      SUPPLIERS OF NATURAL RUBBER

      SUPPLIERS OF PVC BATTERY SEPARATORS

      SUPPLIERS OF LEAD INGOTS

      SUPPLIERS OF PVC GRANULES/PVC MASTER BATCHES

      SUPPLIERS OF SULPHURIC ACID


      APPENDIX – A:

      01. PLANT ECONOMICS

      02. LAND & BUILDING

      03. PLANT AND MACHINERY

      04. OTHER FIXED ASSESTS

      05. FIXED CAPITAL

      06. RAW MATERIAL

      07. SALARY AND WAGES

      08. UTILITIES AND OVERHEADS

      09. TOTAL WORKING CAPITAL

      10. TOTAL CAPITAL INVESTMENT

      11. COST OF PRODUCTION

      12. TURN OVER/ANNUM

      13. BREAK EVEN POINT

      14. RESOURCES FOR FINANCE

      15. INSTALMENT PAYABLE IN 5 YEARS

      16. DEPRECIATION CHART FOR 5 YEARS

      17. PROFIT ANALYSIS FOR 5 YEARS

      18. PROJECTED BALANCE SHEET FOR (5 YEARS)

      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution