Pre Engineered Buildings and Cold Formed Structure
- More than 40 years of experience
- Managed by expert industrial consultants
- ISO 9001-2015 Certified
- Registered under MSME, UAM No: DL01E0012000
- 24/5 Research Support
Get your quesries resolved from an industry expert. Ask your queries before report or book purchase. - Custom Research Service
Speak to the our consultant to design an exclusive study to serve your research needs. - Quality Assurance
All reports are prepared by highly qualified consultants & verified by a panel of experts. - Information Security
Your personal & confidential information is safe & secure.
PRE ENGINEERED BUILDINGS AND COLD FORMED STRUCTURE
[EIRI/EDPR/4743] J.C.: 2963XL
INTRODUCTION
Pre Engineered Buildings (PEB) is the buildings which are engineered at a factory and assembled at site. Usually PEBs are steel structures. Built-up sections are fabricated at the factory to exact size, transported to site and assembled at site with bolted connections. This type of Structural Concept is generally used to build Industrial Buildings, Metro Stations, and Warehouses etc.
The adoptability of PEB in the place of Conventional Steel Building design concept resulted in many advantages, including economy & easier fabrication. These type of building structure can be finished internally to serve any functions that is actually help in low rise building design. Examples of Pre-Engineered Buildings are warehouses, Canopies, Factories, Bridges etc.
Pre-Engineered Steel Buildings use a combination of built-up sections, hot rolled sections and cold formed elements which provide the basic steel frame work with a choice of single skin sheeting with added insulation or insulated sandwich panels for roofing and wall cladding. The concept is designed to provide a complete building envelope system which is air tight, energy efficient, optimum in weight and cost and, above all, designed to fit user requirement like a well fitted glove.
These Pre-Engineered Steel Buildings can be fitted with different structural accessories including mezzanine floors, canopies, fascias, interior partitions, crane systems etc. The building is made water-tight by use of special mastic beads, filler strips and trims. This is a very versatile building system and can be finished internally to serve any required function and accessorized externally to achieve attractive and distinctive architectural styles. It is most suitable for any low-rise building and offers numerous benefits over conventional buildings.
Pre-engineered buildings are generally low rise buildings; however the maximum eave heights can go upto 25 to 30 metres. Low rise buildings are ideal for offices, houses, showrooms, shop fronts etc. The application of pre-engineered concept to low rise buildings is very economical and speedy. Buildings can be constructed in less than half the normal time especially when complimented with other engineered sub-systems.
The most common and economical type of low-rise building is a building with ground floor and two intermediate floors plus roof. The roof of a low rise building may be flat or sloped. Intermediate floors of low rise buildings are made of mezzanine systems. Single storeyed houses for living take minimum time for construction and can be built in any type of geographic location like extreme cold hilly areas, high rain prone areas, plain land, extreme hot climatic zones etc.
Purlin is a horizontal structural member spanning between beams or trusses to support a roof deck. In slope glazing, purlins are the horizontal framing members. Purlins have been used in roofing system for decades. Roof purlins account for a substantial proportion of cold formed steel usage in buildings. Purlins are ideally suited for production as cold rolled sections and over 60000 tonnes of cold formed steel purlins are produced annually in United Kingdom.
There are various types of purlins available in the market; the most commonly are Cee and Zed purlins which take the form of C and Z letter. The Zed shape purlin was introduced from USA around 1960. Another type of purlins shape is the Sigma shape which was introduced a few years later after the Zed shape. In recent years the fierce competition between purlin manufacturers has led to substantial research and development effort in the field of purlin design to produce purlin with even greater efficiency. This has lead to further developments of the Zed shape in particular such as Zeta shape and the UltraZED shape. All the typical shapes of purlins are shown in Figure 1.1. Most purlins are produced from steel and most recently galvanized steel which has a greater advantage over steel in terms of strength. Most purlins are cold formed which means that they are formed in the cold state from a strip of uniform thickness.
COST ESTIMATION
Plant Capacity 40 MT/Day
Land & Building Rs. 5.05 Cr
Plant & Machinery Rs. 7.65 Cr
Working Capital for 2 Months Rs. 16.57 Cr
Total Capital Investment Rs. 29.49 Cr
Rate of Return 23%
Break Even Point 53%
CONTENTS
INTRODUCTION
ROOF PURLIN SYSTEM IN COMMON USE
WHY CHOOSE PRE-ENGINEERED STEEL BUILDINGS
1. COST SAVINGS
2. QUALITY CONTROL
3. QUICK ERECTION
4. FLEXIBILITY
5. ENERGY EFFICIENCY
TOP MANUFACTURERS COMPANY IN INDIA
RIDDHIMA BUILDING SYSTEM PRIVATE LIMITED
KIRBY BUILDING SOLUTIONS INDIA LIMITED
MULTI DÉCOR INDIA PRIVATE LIMITED
TATA BLUESCOPE STEEL LIMITED
EVEREST INDUSTRIES LIMITED
TIGER STEEL ENGINEERING INDIA PRIVATE LIMITED
LLOYD INSULATIONS INDIA LIMITED
EPACK PREFAB
JINDAL BUILDSYS LIMITED
HINDUSTAN ALCOX LIMITED
VARIOUS SYSTEMS IN PEB
PRIMARY SYSTEM
SECONDARY SYSTEM
WIND BRACING SYSTEM
ROOFING & CLADDING SYSTEM
ACCESSORIES
FINISHING
COMPONENTS OF PEB
THERE ARE BASICALLY NINE MAJOR COMPONENTS IN A PRE-ENGINEERED BUILDING SUCH AS:
MAIN FRAMING
END WALL FRAMING
PURLINS, GIRTS AND EAVE STRUTS
THE PURLINS ARE SUBJECTED TO THE FOLLOWING LOADS:-
THE GIRTS ARE SUBJECTED TO THE FOLLOWING LOADS:-
THE EAVE STRUTS ARE SUBJECTED TO THE FOLLOWING LOADS:-
PANELS AND INSULATION
CRANE SYSTEM
MEZZANINE SYSTEM
BRACING SYSTEM
PAINTS AND FINISHES
DOORS AND WINDOWS
FALSE CEILING
PARTITION WALLS
FLOORING
ADVANTAGES OF PEB:
BENEFITS
DISADVANTAGES OF PEB
INNOVATION IN CONSTRUCTION: ADVANCING BUILDING TECHNIQUES WITH PEB
USES AND APPLICATION
COLD FORMED STEEL PURLIN
TYPES OF COLD FORMED ROOF PURLIN
FIGURE: COMMON C AND Z SHAPED-PURLINS
ADVANTAGES OF COLD STEEL OVER OTHER MATERIALS
COLD FORMED STEEL IN ENGINEERING STRUCTURE
PROCESS FLOW CHART FOR PEB
FABRICATION PROCESS OF PEB
THE PEB PRODUCTION PROCESS PRIMARILY CONSISTS OF FOUR MAJOR PARALLEL PROCESSING LINES, AS UNDER:
THE PRODUCTION & SHIPMENT OF THESE COMPONENTS FOR A PEB STRUCTURE USES FOLLOWING PROCESSES:
CUTTING
CNC PLASMA & OXY GAS
CNC (6100 X 20) MM SHEARING MACHINE
CNC (6100 X 12) MM SHEARING MACHINE
EQUIPMENT AND MACHINES:
HOLE PUNCHING
ASSEMBLING
VERTICAL ASSEMBLING
HOT ROLLED ASSEMBLING
AUTOMATIC ASSEMBLING MACHINE
EQUIPMENT AND MACHINES
WELDING AND CONNECTION DETAILS WELDING
MANUAL WELDING AND DETAILING
EQUIPMENT AND MACHINES
SURFACE CLEANING
SHOT BLASTING MACHINE, ROOM (8000 X 20000 X 6000 MM)
EQUIPMENT AND MACHINES:
PAINTING
PAINTING MACHINE
EQUIPMENT AND MACHINES
LOADING
QUALITY CONTROL
FOR FABRICATION PROCESS
FABRICATION TOLERANCES:
STRAIGHTNESS:
TWISTS:
CAMBER:
LENGTH:
SQUARE-NESS AT END OF MEMBERS
BUTT JOINTS
DEPTH OF MEMBER
WEB PLATES:
FLANGE PLATES:
COLUMN FABRICATION TOLERANCES:
CRANE RUNWAY GIRDER FABRICATION TOLERANCES:
GIRDER ENDS:
CRANE GIRDER ALIGNMENT:
FOR HOLING PROCESS
FOR WELDING PROCESS
INSPECTION OF WELDS:
TESTS ON WELDS:
(1) MAGNETIC PARTICLE TEST:
(2) DYE PENETRATION TEST:
(3) RADIOGRAPHIC INSPECTION:
TESTING OF FABRICATION COMPONTS
(6) ROOF SHEETING:
(7) WALL PANELS:
(8) HEATING FASTENERS:
(9) SEALER:
(10) CLOSURES:
(11) FLASHING AND TRIM:
(12) ROOF & WALL BRACINGS:
(14) PAINTING FOR STRUCTURAL STEEL WORK:
MANUFACTURE AND CONSTRUCTION OF STEEL FORMED STRUCTUE
MANUFACTURING METHODS:
CONSTRUCTION METHODS:
PANELIZATION METHOD OF FRAMING VERSUS CONVENTIONAL FIELD ASSEMBLY METHOD:
FRAMING OPTIONS:
COLD FORMED STEEL STRUCTURAL MEMBERS
INDIVIDUAL STRUCTURAL FRAMING MEMBERS (BAR MEMBERS):
(I) SINGLE OPEN SECTIONS:
(II) THE HOLLOW FLANGE BEAM (LITESTEEL BEAM):
(III) OPEN BUILT-UP SECTIONS:
(IV) CLOSED BUILT-UP SECTIONS:
PANELS AND DECKS:
APPLICATION OF COLD FORMED STEEL STRUCTURAL MEMBERS
CFS PRIMARY LOAD BEARING MEMBERS:
THE PRIMARY AREAS OF LOAD-BEARING CFS APPLICATIONS ARE: FRAMING:
COMPOSITE SECTIONS:
LATERAL LOADS RESISTING SYSTEM (LFRS):
BENEFITS OF COLD FORMED STEEL SECTION
1. NO INSECT AND FUNGAL INFECTION:
2. CONSISTENCY AND ACCURACY OF PROFILE:
3. VERSATILITY OF PROFILE SHAPE:
4. IT COULD BE PRE-GALVANIZED OR PRE-COATED:
5. VARIETY OF CONNECTION AND JOINTING METHODS:
6. SPEEDY IN CONSTRUCTION, AND SUIT FOR SITE ERECTION:
7. INCREASE IN YIELD STRENGTH DUE TO COLD FORMING:
8. MINIMIZATION OF MATERIAL USAGE:
9. HIGH PROFITABILITY:
PRE ENGINEERED BUILDING MARKET OVERVIERW
PRE-ENGINEERED BUILDINGS MARKET SEGMENT ANALYSIS:
PRE-ENGINEERED BUILDINGS MARKET REGIONAL INSIGHTS:
PREENGINEERED BUILDING MARKET ANALYSIS
OVERVIEW OF ECONOMY GLOBAL ECONOMY
PEB OVERVIEW
MARKET SIZE AND EXPECTED GROWTH
EXHIBIT 5: US PEB MARKET GROWTH
KEY REGULATIONS AND POLICIES
INDUSTRY SPECIFIC REGULATIONS
BUREAU OF INDIAN STANDARDS ACT, 2016(“BIS ACT”)
THE LEGAL METROLOGY ACT, 2009 AND LEGAL METROLOGY (PACKAGED COMMODITIES) RULES, 2011 (“LM RULES”)
STEEL AND STEEL PRODUCTS (QUALITY CONTROL) ORDER, 2020 (“QC ORDER”)
ENVIRONMENT LAWS AND REGULATIONS
THE ENVIRONMENT (PROTECTION) ACT, 1986 AND THE ENVIRONMENT (PROTECTION) RULES, 1986
THE ENVIRONMENTAL IMPACT ASSESSMENT NOTIFICATION, 2006 (“EIA NOTIFICATION”)
THE WATER (PREVENTION AND CONTROL OF POLLUTION) ACT, 1974 (“WATER ACT”)
THE AIR (PREVENTION AND CONTROL OF POLLUTION) ACT, 1981 (“AIR ACT”)
THE HAZARDOUS AND OTHER WASTES (MANAGEMENT AND TRANSBOUNDARY MOVEMENT) RULES, 2016 (“HAZARDOUS WASTE RULES”)
INDUSTRIAL, EMPLOYMENT AND LABOUR LAWS
THE PUBLIC LIABILITY INSURANCE ACT, 1991 & THE PUBLIC LIABILITY INSURANCE RULES, 1991
THE FACTORIES ACT, 1948
THE CODE ON WAGES, 2019
THE OCCUPATIONAL SAFETY, HEALTH AND WORKING CONDITIONS CODE, 2020
THE CODE ON SOCIAL SECURITY, 2020
THE INDUSTRIAL RELATIONS CODE, 2020
THE CHILD AND ADOLESCENT LABOUR (PROHIBITION AND REGULATION) ACT, 1986
THE SEXUAL HARASSMENT OF WOMEN AT WORKPLACE (PREVENTION, PROHIBITION AND REDRESSAL) ACT, 2013
INTELLECTUAL PROPERTY LAWS
THE PATENTS ACT, 1970 (“PATENTS ACT”)
THE TRADE MARKS ACT, 1999 (“TRADE MARKS ACT”)
THE COPYRIGHT ACT, 1957 (“COPYRIGHT ACT”)
THE DESIGNS ACT, 2000 (“DESIGNS ACT”)
FOREIGN TRADE REGULATIONS
FOREIGN EXCHANGE MANAGEMENT ACT, 1999 (“FEMA”)
THE FOREIGN TRADE (DEVELOPMENT AND REGULATION) ACT, 1992 AND FOREIGN TRADE (REGULATION) RULES, 1993
LAWS IN RELATION TO TAXATION
INCOME TAX ACT, 1961
GOODS AND SERVICES TAX ACT, 2017
GENERAL LAWS
THE CONSUMER PROTECTION ACT, 2019
THE COMPETITION ACT, 2002
THE COMPANIES ACT, 2013 (“COMPANIES ACT”)
THE INDIAN CONTRACT ACT, 1872
INDIAN STAMP ACT, 1899
THE REGISTRATION ACT, 1908
THE NEGOTIABLE INSTRUMENTS ACT, 1881
SUPPLIERS OF PEB STRUCTURE
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF STRUCTURAL STEEL PLATE
SUPPLIERS OF STRUCTURAL STEEL SHEET PLATE
SUPPLIERS OF MIG WELDING WIRE ELECTRODE
SUPPLIERS OF ZINC INGOT
SUPPLIERS OF CAUSTIC SODA
SUPPLIERS OF HYDROCHLORIC ACID
SUPPLIERS OF DEGREASING CHEMICAL
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF UNCOILING MACHINE
SUPPLIERS OF SHEET LAVELING MACHINE
SUPPLIERS OF PUNCHING PRESS
SUPPLIERS OF POWER PRESS
SUPPLIERS OF SHEARING MACHINE
SUPPLIERS OF ROLLING MACHINE
SUPPLIERS OF BENDING MACHINE
SUPPLIERS OF CNC PLASMA CUTTING MACHINE
SUPPLIERS OF COLD ROLL FORMING MACHINE
SUPPLIERS OF WELDING MACHINESUPPLIERS OF MIG WELDING MACHINE
SUPPLIERS OF AUTOMATIC H-BEAM WELDING MACHINE
SUPPLIERS OF PAINTING EQUIPMENTS
SUPPLIERS OF EOT CRANES
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF ELECTRIC MOTOR
SUPPLIERS OF EFFLUENT TREATMENT PLANT (ETP PLANT)
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF PLATFORM WEIGHING MACHINE
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SHOT BLASTING MACHINE
SUPPLIERS OF JIGS AND FIXTURE
SUPPLIERS OF SUBMERSIBLE WATER PUMP
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
UTILITIES
POWER
WORKING
TOTAL MANPOWER AND PAYROLL
INDIAN MANUFACTURING INDUSTRY
INTRODUCTION
MARKET SIZE
INVESTMENT
GOVERNMENT INITIATIVES
ROAD AHEAD
FIREFIGHTING EQUIPMENTS MANUFACTURERS & SUPPLIERS
WEIGHING BREIDGE MANUFACTURER
WEIGHING MACHINES
LABORATORTY EQUIPMENTS MANUFACTURERS
D.G. SET MANUFACTURERS & SUPPLIERS
ELECRICAL GOOD & SWITCH MANUFACTURE
SS PIPE & TUBE MANUFACTURER
DOCUMENTS REQUIRED FOR LICENSES
LIST OF DOCUMENTS:
LICENCE OF PLASTIC WASTE IMPORT
DOCUMENTS REQUIRED ARE:-
ADDRESSES OF RELEVANT GOVERNMENT OFFICES
ADDRESSES OF FINANCIAL INSTITUTIONS
SWOT ANALYSIS
STRENGTHS
WEAKNESSES
OPPORTUNITIES
THREATS
ORGANIZATION CHART
PLANT LAYOUT
IMPLEMENTATION SCHEDULE
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
How to Make Project Report?
Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.
We can prepare detailed project report on any industry as per your requirement.
We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.
Detailed Project Report (DPR) gives you access to decisive data such as:
- Market growth drivers
- Factors limiting market growth
- Current market trends
- Market structure
- Key highlights
Overview of key market forces propelling and restraining market growth:
- Up-to-date analyses of market trends and technological improvements
- Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
- An array of graphics, BEP analysis of major industry segments
- Detailed analyses of industry trends
- A well-defined technological growth with an impact-analysis
- A clear understanding of the competitive landscape and key product segments
Need Customized Project Report?
- Ask for FREE project related details with our consultant/industry expert.
- Share your specific research requirements for customized project report.
- Request for due diligence and consumer centric studies.
- Still haven't found what you're looking for? Speak to our Custom Research Team
About Engineers India Research Institute:
Our Approach
- Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
- The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
- We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report
Why buy EIRI reports?
- Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
- Offer real analysis driving variables for the business and most recent business sector patterns in the business
- This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
- Report gives investigation and top to bottom money related correlation of real players/competitors
- The report gives gauges of key parameters which foresees the business execution