Menu
Your Cart

    Railway Wagon Manufacturing (Cap: 8 Nos/Day)

    Railway Wagon Manufacturing (Cap: 8 Nos/Day)
    Railway Wagon Manufacturing (Cap: 8 Nos/Day)
    ₹ 0 INR
      Why Choose Us
      • More than 40 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.

      RAILWAY WAGON MANUFACTURING (CAP: 8 NOS/DAY) 

      [EIRI/EDPR/4730] J.C.: 2950XL

      A wagon is an element of the train. It is a type of towed vehicle designed to move along a railway track. Unlike the car which is reserved for transporting people, the wagon is used for the transport of goods or animals. There are many different types, depending on use: wagons for transporting livestock, refrigerated wagons, tanker wagons, crane wagons, container wagons.


      COST ESTIMATION

      Plant Capacity            8 Nos/Day

      Land & Building (80,000 sq.mt.)    Rs. 70.58 Cr

      Plant & Machinery                    Rs. 87.11 Cr

      Working Capital for 2 Months    Rs. 97.05 Cr

      Total Capital Investment          Rs. 258.11 Cr

      Rate of Return                          76%

      Break Even Point                      25%


      CONTENTS

      INTRODUCTION

      TYPES OF WAGONS:-

      CLASSIFICATION OF RAILWAY WAGON

      (1) ACCORDING TO IT’S UNDER GEAR

      (2) ACCORDING TO ITS UTILITY

      TYPES OF WAGON

      (1) COVERED WAGON

      CONSTRUCTION OF COVERED WAGON

      A. SIDES

      B. ENDS

      C. ROOF

      D. DOOR

      BCN

      BCNA

      BCNA-HS

      BCCN/BCCNA/BCCNB

      BCCN

      (2) OPEN WAGON

      A. SIDES

      B. ENDS

      C. DOORS

      BOXN WAGON – 

      BOXNHA 

      BOXNHS 

      BOXN CR 

      BOXNLW 

      LIGHT WT. BOXN WAGON 

      BOXNHL 

      (3) FLAT WAGON

      CONSTRUCTION OF FLAT WAGON 

      A. ENDS

      B. SIDE STANCHION

      FLAT TYPE – 

      (4) TANK WAGON

      TANK TYPE – 

      B.I.S. SPECIFICATION

      (1) IS:M-44 SPECIFICATIONSS SHEET FOR WAGON

      OVERVIEW OF INDIAN TRADE SCENARIO

      COMPARISON OF LOGISTIC COST

      A) HIGH SHARE OF ROAD IN INTER-MODAL MIX

      B) INEFFICIENT TRANSPORT VEHICLES

      C) ROAD INFRASTRUCTURE CONSTRAINTS

      OVERVIEW ON INDIAN TRADE THROUGH RAIL MODE

      SHARE OF RAIL MODE IN DOMESTIC FREIGHT

      OUTLOOK FOR MODAL SHARE AND VOLUME GROWTH OF RAILWAYS IN FREIGHT TRANSPORT

      FUTURE POTENTIAL FOR RAIL AS MODE OF TRANSPORT

      INDIA’S INVESTMENT IN TRANSPORT INFRASTRUCTURE

      CAPITAL EXPENDITURE PLAN BETWEEN FISCAL 2020 TO FISCAL 2025

      KEY INDUSTRIES OF INDIA DEPENDING ON RAIL FREIGHT

      RAILWAY INFRASTRUCTURE IN INDIA

      CONTRIBUTION OF TRANSPORTATION SECTOR TO INDIAN ECONOMY

      RAILWAY INFRASTRUCTURE

      OVERVIEW ON INDIAN RAIL TRACK LENGTH

      FREIGHT AND PASSENGERS CARRIED BY INDIAN RAILWAYS

      NO OF PASSENGER OVER THE YEARS

      RAILWAY’S CURRENT SHARE IN FREIGHT MOVEMENT – COMMODITY-WISE (AS ON FISCAL 2022)

      GOVERNMENT POLICIES FOR RAILWAY FREIGHT INDUSTRY

      BUDGETARY SUPPORT

      BUDGETARY OUTLAY TOWARD RAILWAY PROJECTS

      NATIONAL INFRASTRUCTURE PIPELINE

      OTHER INITIATIVES

      DEDICATED FREIGHT CORRIDOR (“DFC”)

      THE MAIN OBJECTIVES OF DFCCIL ARE AS BELOW:

      RAILWAY INFRASTRUCTURE – KEY SEGMENTS

      DFCS ARE PROPOSED TO USED STATE-OF-THE ART TECHNOLOGY INCLUDING THE BELOW:

      DEDICATED FREIGHT CORRIDOR IN INDIA

      DIAMOND QUADRILATERAL NETWORK

      INDIA-MIDDLE EAST TRADE CORRIDOR (“IMEC”)

      OBJECTIVES:

      HIGH SPEED RAIL CORRIDOR

      VANDE BHARAT EXPRESS

      NATIONAL RAIL PLAN 2030

      OBJECTIVES, AND PLANS TO IMPROVE MODAL SHARE OF RAILWAYS IN FREIGHT TRANSPORT

      FOLLOWING ARE THE KEY OBJECTIVES OF NRP:

      PROPOSED EXPENDITURE UNDER NRP (₹ LAKH CRORE)

      STRATEGY TO INCREASE MODAL SHARE OF RAILWAYS TO 45% BY FISCAL 2030

      A. STRATEGY TO ADDRESS SUPPLY SIDE CONSTRAINTS

      B. STRATEGY TO ADDRESS DEMAND SIDE CONSTRAINTS

      WORLD RAILWAY NETWORK

      CHALLENGES

      VOLATILITY IN MATERIAL COSTS

      TREND IN INTERNATIONAL STEEL PRICES

      • INCREASING COMPETITION

      • HIGH INITIAL INVESTMENTS

      • RISKS OF MACROECONOMIC AND SECTORAL POLICY CHANGES

      RAILWAY WAGONS INDUSTRY

      OVERVIEW

      SPLIT OF TOTAL ROLLING STOCK

      INDIAN RAILWAY ROLLING STOCK

      PAST TREND IN WAGON ORDERS

      TREND ON WAGON TENDERING BY INDIAN RAILWAYS

      TREND IN NEW WAGONS INDUCTED BY INDIAN RAILWAYS

      PRIVATE SECTOR

      GROWTH OUTLOOK

      FORECAST OF INDIAN RAILWAY WAGON REQUIREMENT

      PRIVATE PLAYERS PARTICIPATION

      BRIEF INFORMATION ON THESE SCHEMES IS PROVIDED BELOW:

      KEY EXPORT DESTINATIONS

      KEY EXPORT DESTINATIONS OF ROLLING STOCK IN FISCAL 2023

      • GOVERNMENT THRUST ON RAIL INFRASTRUCTURE IMPROVEMENT

      PROJECTED GROWTH IN PASSENGER TRAFFIC

      • INCREASE IN DEMAND FROM THE PRIVATE SECTOR

      • IMPETUS FROM THE ATMA NIRBHAR BHARAT ABHIYAN

      • PLI SCHEME

      • AUTOMATION, ADOPTION OF TECHNOLOGY AND TECHNOLOGICAL PARTNERSHIPS

      KEY CHALLENGES

      • IMPORT DEPENDENCE FOR MAJOR ACCESSORIES AND COMPONENTS

      THE BELOW CHART DEPICTS THE IMPORT TREND OF ROLLING STOCK:

      TREND IN IMPORTS OF ROLLING STOCK ACCESSORIES

      • TECHNOLOGICAL DEPENDENCIES

      PASSENGER COACH INDUSTRY

      CURRENT SITUATION OF PASSENGER COACHES IN INDIA’S RAILWAYS

      INDIAN RAILWAY ROLLING STOCK

      MARKET SIZE AND GROWTH OUTLOOK FOR PASSENGER COACH

      PROJECTED GROWTH IN PASSENGER TRAFFIC - BY TYPE

      FORECAST OF INDIAN RAILWAY COACHES REQUIREMENT

      INDIAN EXPORTS FOR PASSENGER COACHES

      EXPORTS OF PASSENGER COACHES FROM INDIA (IN VALUE)

      EXPORTS OF PASSENGER COACHES FROM INDIA (IN VOLUME) 

      METRO RAIL SEGMENT

      METRO COACH MANUFACTURING FACILITIES IN INDIA

      EXPANSION OF METRO RAIL

      INDIAN METRO RAIL COVERAGE

      METRO RAIL NETWORK UNDER CONSTRUCTION

      METRO RAIL NETWORK UNDER APPRAISAL/APPROVAL

      METRO RAIL COACH INDUSTRY OUTLOOK

      VANDE BHARAT EXPRESS

      OBJECTIVE

      VISION

      FEATURES AND AMENITIES IN VANDE BHARAT EXPRESS

      VANDE BHARAT COACH INDUSTRY OUTLOOK

      EXPORTS OPPORTUNITY OF PASSENGER COACHES

      MARKET FOR KEY RAIL/ROLLING STOCK COMPONENTS

      OVERVIEW

      KEY ROLLING STOCK ACCESSORIES MANUFACTURERS IN INDIA

      IMPORT DEPENDENCE FOR MAJOR ACCESSORIES

      GROWTH DRIVERS AND OUTLOOK

      RAILWAY PROPULSION SYSTEM INDUSTRY

      GLOBAL INDUSTRY

      GLOBAL RAILWAY PROPULSION SYSTEM MARKET

      INDIAN INDUSTRY

      GROWTH DRIVERS FOR INDIAN RAIL PROPULSION SYSTEM INDUSTRY

      • ELECTRIFICATION INITIATIVES

      • HIGH-SPEED RAIL CORRIDOR

      • SUPPORTIVE GOVERNMENT POLICIES AND GROWING INFRASTRUCTURE INVESTMENTS

      • RISING PASSENGER AND FREIGHT DEMANDS

      • GROWING FOCUS ON TECHNOLOGICAL INNOVATION AND SUSTAINABILITY

      • MODERNIZATION AND UPGRADATION OF EXISTING RAIL INFRASTRUCTURE

      • EXPANSION OF URBAN TRANSIT MODE

      MANUFACTURING PROCESS FOR BOXNHL WAGON

      DESCRIPTION ABOUT BOXHNL WAGON

      SALIENT FEATURES FOR BOXNHL WAGON

      DETAILS SALIENT FEATURES OF BOXNHL WAGON

      2. DRAW AND BUFFING GEAR:-

      3. BOGIE:-

      4. BRAKE GEAR:-

      5. RUNNING GEAR:-

      STANDARD FEATURES OF ‘BOXNHL’ WAGON

      (1) UNDER FRAME:

      MAIN PARTS OF UNDERFRAME ARE:-

      (2) CENTER SILL:

      (3) SIDE BODY:

      (4) END BODY:

      (5) DOORS:

      (6) BOGIE:

      BOXHNL WAGON HAS CAS NUB BOGIE

      CAS NUB BOGIE HAS FOLLOWING COMPONENTS

      FIGURE BOGIE GENERAL ARRANGEMENT FOR CASNUB

      FIGURE BOGIE GENERAL ARRANGEMENT CASNUB

      7. CENTRE BUFFER COUPLER

      ADVANTAGES OF CBC:-

      COUPLER BODY:

      KNUCKLE:

      (8) BRAKE SYSTEM

      AIR BRAKE SYSTEM:

      A) DISTRIBUTOR VALVE:

      B) BRAKE CYLINDER:

      C) CUT OFF ANGLE COCK:

      D) DIRT COLLECTOR:

      E) RESERVOIR:

      F) METAL PIPES AND JOINTS:

      G) SLACK ADJUSTER:

      PROCESS FLOW CHART

      MAIN STEPS FOR FABRICATION

      MAIN PROCESS

      THE MAIN PROCESS HAS FOLLOWING STEPS ARE GIVEN BELOW

      (1) CUTTING

      (A) GUILLOTINING

      THE FOLLOWING GUILLOTINE CLEARANCE SETTINGS ARE GIVEN FOR GUIDANCE:-

      (B) PLASMA CUTTING

      (A) PLASMA CUTTING:-

      (B) CNC PLASMA CUTTING:-

      CUTTING GASES 

      (C) ABRASIVE CUT – OFF WHEELS 

      (D) ARC-AIR GOUGING 

      (E) POWDER CUTTING 

      (F) SLITTING

      (G) COLD SAWING 

      (H) BLANKING AND PUNCHING 

      (I) DRILLING 

      (2) STRAGHTENING

      STRAIGHTENING OF IRSM-44: 

      (3) PRESSING

      (A) HYDRAULIC PRESS:-

      (B) POWER HAMMER:-

      (C) DROP HAMMER:-

      (4) WELDING

      (A) ARC WELDING:-

      ARC WELDING CIRCUIT:-

      DEFETS OF ARC WELDING:-

      1. OVERLAP:- 

      2. UNDERCUT:-

      3. POROSITY:-

      4. SPATTER:-

      5. CRATER:-

      (B) GAS METAL ARC WELDING (GMAW)/MIG:-

      DEFECTS OF MIG WELDING:-

      1. OVERLAP:-

      2. UNDERCUT:-

      3. POROSITY:-

      4. SPATTER:-

      5. CRATER:-

      IN A WAGON, VARIOUS PARTS ARE WELDED AS PRESCRIBED FOLLOWING:-

      WELDING OF IRS M-44

      (A) WELDING PROCESS

      (B) WELD REPAIRS 

      (C) POST WELD CLEANING

      (D) MECHANICAL CLEANING 

      (E) WELDING PROCEDURE:- 

      GENERAL PRECAUTIONS IN WELDING OF STAINLESS STEEL 

      WELDABILITY ISSUES: 

      PREPARATION PRIOR TO WELDING: 

      PRECAUTIONS DURING WELDING: 

      PRECAUTIONS AFTER WELDING: 

      QUALITY REQUIREMENTS OF WELDING – 

      FABRICATION OF DIFFERENT PARTS

      (1) CENTER SILL

      3 FINISHED CENTER SILL SET

      Z-SECTION

      CENTER PART OF CENTRE SILL

      END PART OF CENTRE SILL

      FIXTURE OF CENTRE SILL

      (2) UNDERFRAME

      UNDER FRAME STRUCTURE

      (3) BODY END

      (5) DOORS

      (7) BRAKING SYSTEM

      SLACK ADJUSTER AUXILIARY RESERVOIR

      DISTRIBUTOR VALVE AND CONTROL BRAKE CYLINDER

      LEVER ASSEMBLY PARTS EMPTY LOAD ADJUSTER

      SHOE BRAKES

      BRAKING PROCESS:-

      (6) FINAL ASSEMBLY

      PROCEDURE:-

      A) REMOVAL:-

      B) INSTALLATION:-

      GENERAL DATA:-

      (7) FINISHING (SHOT BLASTING)

      (A) SURFACE PREPARATION

      SURFACE PREPARATION OF THE WAGON BODY AND UNDER FRAME 

      SHOT BLASTING CHAMBER

      (B) PAINTING OF WAGON BODY AND UNSER FRAME 

      FOR STAINLESS STEEL 

      PRECAUTIONS TO BE TAKEN IN WORK AREA 

      PRECAUTIONS TO BE TAKEN IN STORAGE 

      PRECAUTIONS TO BE TAKEN IN STORAGE OF IRS: M 44 STEELS

      (8) TESTING

      (1) RADIOGRAPHY TEST (RT):-

      RT MACHINE

      (2) DI-PENETRATION TEST:-

      (3) COMPRESSIVE STRENGTH TEST:-

      SETUP FOR TEST

      LOAD PROVIDING MACHINE

      (4) WATER TESTING:-

      WATER TESTING UNIT

      (6) VISUAL INSPECTION:-

      (7) BRAKING SYSTEM TEST:-

      PRESSURE GENERATING UNIT

      PLANT LOCATION FACTORS

      PRIMARY FACTORS

      1. RAW-MATERIAL SUPPLY:

      2. MARKETS:

      3. POWER AND FUEL SUPPLY:

      4. WATER SUPPLY:

      5. CLIMATE:

      SPECIFIC FACTORS

      6. TRANSPORTATION:

      A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES

      7. WASTE DISPOSAL:

      8. LABOR:

      9. REGULATORY LAWS:

      10. TAXES:

      11. SITE CHARACTERISTICS:

      12. COMMUNITY FACTORS:

      13. VULNERABILITY TO WARTIME ATTACK:

      14. FLOOD AND FIRE CONTROL:

      EXPLANATION OF TERMS USED IN THE PROJECT REPORT

      1. DEPRECIATION:

      2. FIXED ASSETS:

      3. WORKING CAPITAL:

      4. BREAK-EVEN POINT:

      5. OTHER FIXED EXPENSES:

      6. MARGIN MONEY:

      7. TOTAL LOAD:

      8. LAND AREA/MAN POWER RATIO:

      PROJECT IMPLEMENTATION SCHEDULES

      INTRODUCTION

      PROJECT HANDLING

      PROJECT SCHEDULING

      PROJECT CONSTRUCTION SCHEDULE

      TIME SCHEDULE

      PLANT LAYOUT

      MANUFACTURERS/SUPPLIERS OF RAILWAY WAGON

      SUPPLIERS OF RAW MATERIALS

      SUPPLIERS OF IRS M-44 SS SHEET

      SUPPLIERS OF CRF SECTION

      SUPPLIERS OF COMPLETE CAS NUB BOGIE ASSEMBLY

      SUPPLIERS OF AIR BRAKE ASSEMBLY

      SUPPLIERS OF WELDING ELECTRODES

      SUPPLIERS OF PAINS MATERIALS

      SUPPLIERS OF OTHER MACHINERY AND EQUIPMENTS

      POWER PRESS

      SHEARING MACHINE

      ROLLING MACHINE

      FLYPRESS

      BENDING MACHINE

      MECHANICAL PRESS

      FORGING PRESSES

      FORGING HAMMER

      UNCOILING MACHINE

      SHEET LAVELING MACHINE

      PUNCHING PRESS

      CNC PLASMA CUTTING MACHINE

      MILLING MACHINE

      CNC LATHE MACHINE

      BOARING MACHINE

      POWER HACKSAW

      GRINDING MACHINE

      PROJECTION WELDER

      SEAM WELDING MACHINE

      SPOT WELDING MACHINE

      GAS WELDING EQUIPMENTS

      MIG WELDING MACHINE

      SUPPLIERS OF DRILLING, LATHE, TAPING MACHINES

      EOT CRANE

      POWER TRANSFORMER

      ELECTRICAL PANEL

      ELECTRIC MOTOR

      COOLING TOWER

      EFFULENT TREATMENT PLANT

      AIR POLLUTION CONTROL EQUIPMENTS

      AIR CONDITIONING EQUIPMENTS

      AIR COMPRESSORS

      PLATFORM WEIGHING MACHINE

      MATERIAL HANDLING EQUIPMENTS

      FIRE FIGHTING EQUIPMENTS

      SHOT BLASTING MACHINE

      JIGS AND FIXTURE

      SUBMERSIBLE WATER PUMP

      SUPPLIERS OF PLANT AND MACHINERY

      SUPPLIERS OF BILLET CUTTING MACHINE

      SUPPLIERS OF ELECTROPLATING PLANT

      SUPPLIERS OF ANNEALING FURNACES

      SUPPLIERS OF HEAT TREATMENT FURNACE

      SUPPLIERS OF HARDNESS TESTING MACHINE

      SUPPLIERS OF CLOSE DIE HOT FORGING MACHINE

      SUPPLIERS OF FORGING DIES

      SUPPLIERS OF INDUCTION HEATING FURNACE

      SUPPLIERS OF CNC LATHE MACHINE

      SUPPLIERS OF CNC MACHINING CENTRE

      SUPPLIERS OF METAL TESTING MACHINE

      SUPPLIERS OF DG SETS

      SUPPLIERS OF EOT CRANES

      SUPPLIERS OF POWER TRANSFORMERS

      SUPPLIERS OF ELECTRICAL PANEL

      SUPPLIERS OF ELECTRIC MOTOR

      SUPPLIERS OF COOLING TOWER

      SUPPLIERS OF EFFULENT TREATMENT PLANT (ETP PLANT)

      SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS

      SUPPLIERS OF AIR CONDITIONING EQUIPMENTS

      SUPPLIERS OF AIR COMPRESSORS

      SUPPLIERS OF PLATFORM WEIGHING MACHINE

      SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS

      SUPPLIERS OF FIRE FIGHTING EQUIPMENTS

      SUPPLIERS OF SHOT BLASTING MACHINE

      SUPPLIERS OF JIGS AND FIXTURE

      LIST OF DOCUMENTS REQUIRED TO GET FOR LICENSES

      DOCUMENTS:

      OTHER LICENSES REQUIRED FOR THE SETUP:

      IMPLEMENTATION SCHEDULE

      ORGANIZATION CHART

      STATUTORY APPROVALS FROM GOVERNMENT

      DETAILS OF TEST FACILITIES AVAILABLE IN INDIA

      STANDARDS OF INFRASTRUCTURE, MANUFACTURING, TESTING AND QUALITY 

      ASSURANCE SYSTEM

      GENERAL REQUIREMENT

      INFRASTRUCTURAL REQUIREMENTS

      MACHINERY & PLANT REQUIREMENTS

      FACILITIES FOR MOUNTING OF CARTRIDGE/ROLLER BEARINGS

      TESTING & MEASUREMENT REQUIREMENTS

      DESIGN INFRASTRUCTURE REQUIREMENTS

      MATERIAL MANAGEMENT REQUIREMENTS

      LABORATORY FACILITIES

      QUALITY ASSURANCE REQUIREMENTS

      USE OF COMPONENTS LIKE BOGIE, AIR BRAKE SYSTEM, COUPLERS ETC DURING WAGON MANUFACTURING


      APPENDIX – A:

      01. PLANT ECONOMICS

      02. LAND & BUILDING

      03. PLANT AND MACHINERY

      04. OTHER FIXED ASSESTS

      05. FIXED CAPITAL

      06. RAW MATERIAL

      07. SALARY AND WAGES

      08. UTILITIES AND OVERHEADS

      09. TOTAL WORKING CAPITAL

      10. TOTAL CAPITAL INVESTMENT

      11. COST OF PRODUCTION

      12. TURN OVER/ANNUM

      13. BREAK EVEN POINT

      14. RESOURCES FOR FINANCE

      15. INSTALMENT PAYABLE IN 5 YEARS

      16. DEPRECIATION CHART FOR 5 YEARS

      17. PROFIT ANALYSIS FOR 5 YEARS

      18. PROJECTED BALANCE SHEET FOR (5 YEARS)

      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution