Toothpick (Wooden) (Production Capacity: 500 Kg/Day)
- More than 40 years of experience
- Managed by expert industrial consultants
- ISO 9001-2015 Certified
- Registered under MSME, UAM No: DL01E0012000
- 24/5 Research Support
Get your quesries resolved from an industry expert. Ask your queries before report or book purchase. - Custom Research Service
Speak to the our consultant to design an exclusive study to serve your research needs. - Quality Assurance
All reports are prepared by highly qualified consultants & verified by a panel of experts. - Information Security
Your personal & confidential information is safe & secure.
TOOTHPICK (WOODEN) (PRODUCTION CAPACITY: 500 KG/DAY)
[EIRI/EDPR/4768] J.C.: 2988INR,2988US$
INTRODUCTION
Toothpicks, simple yet versatile tools, have ascended from an ancient oral hygiene practice to use in meat culinary applications, including skewering appetizers, sandwiches, and rolls, creating finger foods, cheese platters and kabobs showing how versatile the simple tooth pick has become. Initially crafted from materials like wood, bone, and feathered quills, toothpicks have been integral to human culture for thousands of years.
The evolution of toothpicks has been marked by changes in both materials and how they are manufactured. Today, they are predominantly made from birch, because of these trees’ straight grain wood and hardness. The production process transforms birchwood into finely crafted toothpicks, each about 2.5 inches long with a pointed end for getting at those gum gaps between teeth. This process involves selecting clear, knot-free wood, machining it into thin strips, and shaping each piece into a toothpick. The result is a high-quality product that is both functional and reliable.
In the culinary world, they have become essential tools for cooking and preparing meals. Chefs and home cooks alike use toothpicks for checking the doneness of baked goods, holding sandwiches or wraps together, and even in artful food presentations for company, guest or patrons. In some cultures, toothpicks are indispensable for picking small pieces of food, like olives or cheese cubes, at social gatherings. Their use extends to craft and construction in miniature models or create artificial flowers where they provide structural support.
A toothpick making machine is a specialized device designed for the efficient production of toothpicks, typically from wood, bamboo, or plastic. The process begins with the preparation of the raw material. In the case of wooden toothpicks, large wood blocks are first seasoned (dried and optionally flavored) and then cut into thin sheets. These sheets are then fed into the toothpick making machine. For bamboo toothpicks, the bamboo is split and processed into fine strips before entering the machine. The machine has multiple sharp blades and cutters that precisely slice the sheets or strips into thin, small sticks, matching the dimensions of a standard toothpick.
Once the raw material is cut into the basic toothpick shape, the machine performs additional processing to refine and finish the product. This involves several stages, such as sharpening both ends of the sticks, smoothing the surface, and sometimes adding flavor or treatment, especially in the case of bamboo toothpicks. Advanced toothpick making machines are equipped with quality control systems that automatically discard any defective pieces. The finished toothpicks are then collected and packaged, often using another section of the machine designed for sorting, counting, and packaging. These machines are highly efficient, capable of producing thousands of toothpicks per hour, and are essential in meeting the global demand for billions of toothpicks.
Tooth picks are short wooden splints, having a sharp end at one side, which when inserted in the cavities in between the two teeth in the mouth take out the deposited food particles. Tooth picks are therefore, very useful small item for preserving out teeth from decay, weakening etc.
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A toothpick usually has one or two sharp ends to insert between teeth. They can come in both wood and plastic, and can also be used for picking up small appetizers (like cheese cubes or olives) or as a cocktail stick.
COST ESTIMATION
Plant Capacity MT/Day
Land & Building ( sq.mt.) Rs. Cr
Plant & Machinery Rs. Cr
Working Capital for 2 Months Rs. Cr
Total Capital Investment Rs. Cr
Rate of Return %
Break Even Point %
CONTENTS
INTRODUCTION
USES AND APPLICATIONS
TOOTHPICK ETIQUETTE AND PROPER USE
CREATIVE USES FOR TOOTHPICKS IN CULINARY ARTS
TYPES OF TOOTHPICK
MARKET SCENARIO OF TOOTHPICK
TOOTHPICK MARKET BY TYPES:
TOOTHPICK MARKET BY APPLICATIONS:
TOOTHPICK MARKET BASED ON REGIONS:
GROWTH FACTORS:
DYNAMICS
RESTRAINTS
OPPORTUNITIES
TRENDS
DRIVERS
CHALLENGES
SEQUENCES IN TOOTHPICK (BAMBOO/WOODEN) MANUFACTURING
LOCATIONAL CONDITION
THE OTHER LOCATION REQUIREMENTS ARE THAT:-
MANUFACTURING PROCESS OF TOOTHPICK
ALL THESE OPERATIONS ARE DESCRIBED IN DETAIL AS BELOW:-
1. SELECTION OF WOOD:-
2. SELECTION OF TOOTH-PICKS:-
3. WOOD WORKING:-
I CROSS-CUTTING: -
II BARKING: -
III SPLINT PEELING: -
IV SPLINT CHOPPING: -
V FINISHING: -
PACKING:-
RAW MATERIALS FOR BAMBOO TOOTHPICK
BAMBOO TOOTHPICK MANUFACTURING DETAILS
CULM SECTIONING, SPLITTING AND ROD MAKING
TOOTHPICK PRODUCTION
CHECKING AND PACKING
PROCESS FLOW DIAGRAM FOR BAMBOO TOOTH PICK
PROCESS FLOW SHEET FOR THE MANUFACTURE OF TOOTHPICKS
PRINCIPLES OF PLANT LAYOUT
EQUIPMENT LAYOUT:
SAFETY:
PLANT EXPANSION:
FLOOR SPACE:
UTILITIES SERVICING:
BUILDING:
MATERIAL-HANDLING EQUIPMENT:
RAILROADS AND ROADS:
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF RAW MATERIALS
SUPPLIERS FOR PLANT AND EQUIPMENTS FOR TOOTHPICKS (WOODEN)
SUPPLIERS FOR PLANT AND MACHINE (IMPORTED)
COMPLETE PLANT SUPPLIERS FOR TOOTHPICK
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
How to Make Project Report?
Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.
We can prepare detailed project report on any industry as per your requirement.
We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.
Detailed Project Report (DPR) gives you access to decisive data such as:
- Market growth drivers
- Factors limiting market growth
- Current market trends
- Market structure
- Key highlights
Overview of key market forces propelling and restraining market growth:
- Up-to-date analyses of market trends and technological improvements
- Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
- An array of graphics, BEP analysis of major industry segments
- Detailed analyses of industry trends
- A well-defined technological growth with an impact-analysis
- A clear understanding of the competitive landscape and key product segments
Need Customized Project Report?
- Ask for FREE project related details with our consultant/industry expert.
- Share your specific research requirements for customized project report.
- Request for due diligence and consumer centric studies.
- Still haven't found what you're looking for? Speak to our Custom Research Team
About Engineers India Research Institute:
Our Approach
- Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
- The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
- We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report
Why buy EIRI reports?
- Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
- Offer real analysis driving variables for the business and most recent business sector patterns in the business
- This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
- Report gives investigation and top to bottom money related correlation of real players/competitors
- The report gives gauges of key parameters which foresees the business execution