Menu
Your Cart

    Detailed Project Report on pre-stressed concrete railway sleeters

    Detailed Project Report on pre-stressed concrete railway sleeters
    Detailed Project Report on pre-stressed concrete railway sleeters
    ₹ 0.00 INR
      Why Choose Us
      • More than 40 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.

      PRE-STRESSED CONCRETE RAILWAY SLEEPERS
       [CODE NO. 2094]  


      Sleepers are members generally laid transverse to the rails on which the rails are supported and fixed, to transfer the loads from rails to the ballast and subgrade below. Sleepers perform the following functions:

      i.    To hold the rails to correct gauge (exact in straight and flat curves, loose in sharp curves and tight in diamond crossings).

      ii.    To hold the rails in proper level transverse tilt i.e., level in turnouts, crossovers, etc., and at 1 in 20 tilt in straight tracks, so as to provide a firm and even support to rails.

      iii.    To act as elastic medium in between the ballast and rails.

      iv.    To distribute the load from the rails to the index area of ballast underlying it or to the girders in case of bridges.

      v.    To support the rails at a proper level in straight tracks and at proper super elevation on curves.

      vi.    Sleepers also add to the longitudinal and lateral stability of the permanent track on the whole.

      vii.    They also provide means to rectify track geometry during service life.
          

      For good performance of sleepers to fulfill the above functions or objectives an ideal sleeper should possess the following characteristics:

      i.    The sleepers to be used should be economical, i.e., they should have minimum possible initial and maintenance costs.

      ii.    The fittings of the sleepers should be such that they can be easily adjusted during maintenance operations such as easy lifting, packing, removal and replacement.

      iii.    The weight of sleepers should not be too heavy or excessively light, i.e., they should have moderate weight, for ease of handling.

      iv.    The design of sleepers should be such that the gauge, alignment of track and levels of the rails can be easily adjusted and maintained.

      v.    The bearing area of sleepers below the rail seat and over the ballast should be enough to resist the crushing due to rail seat and crushing of the ballast underneath the sleeper.

      vi.    The sleeper design should be such as to facilitate easy removal and replacement of ballast.

      vii.    The sleepers should be capable of resisting shocks and vibrations due to passage of heavy loads of high-speed limits.

      viii.    The design of the sleepers should be such that they are not damaged during packing processes.

      ix.    The insulation of rails should be possible for track circuiting, if required, through sleepers.


      Prestressed concrete is the concrete in which permanent internal stresses are deliberately introduce, usually by tensioned steel, to counteract to the designed degree, the stresses caused in the member in service.

      Pre-tensioning is the method of prestressing concrete in which the tenons are tensioned before concreting. Where as post-tensioning is the method of prestressing concrete in which prestressing steel is tensioned against the hardened concrete. Initial tension is the maximum stress induced in the prestressing tenon at the time of the stressing operation and initial prestress is the stress in the concrete at transfer. Although the first experiments were made in USA and the first patent for prestressed concrete was issued in 1988 for P.H. Jackson of Sanfransisco, it was developed in Europe. French, German & Danish engineers tried various ways of prestressing concrete, but none was successful till 1930 when in France, the high strength steel wire was used for prestressing concrete. After 1950s, actually, the prestressed concrete has found its major uses in fabricated constructions where it can be shop controlled & tested. Lift slab constructions were precast or cast on-site. Today it can be well seen that prestressed concrete is finding its varied uses in various types of constructions.

      Prestressed concrete sleepers are now being increasingly used by most of the railways throughout the world in preference to timber ones because of scarcity of timber and the inherent technical advantages of concrete sleepers for use with long welded tracks carrying heavier axle loads and designed for greater speeds. The superior structural properties of concrete sleepers add considerably to the overall stability and better performance of the total track-structure. Concrete sleepers with their elastic fastenings also provide better safeguard for important track parameters, such as, gauge, cross levels form of twist, alignment etc. as compared to other types of sleepers. Of the several types of concrete sleepers in use, survey indicates that a majority of them, as much as 70% are monoblock prestressed concrete sleepers. Till today, more than 120 million of these type of concrete sleepers have been load on the track all over the world. About 15 million prestrressed concrete sleepers are produced per annum by the various railways of the world out of which pretensioned sleepers alone account for over 70%.


      COST ESTIMATION

      Plant Capacity                                                600.00 No./day
      Land & Building (8000 Sq.Mtr)                    Rs. 3.17 Cr
      Plant & Machinery                                          Rs. 2.00 Cr
      W.C. for 1 Month                                             Rs. 1.76 Cr
      Total Capital Investment                               Rs.  7.05 Cr
      Rate of Return                                                34%
      Break Even Point                                           50%



      INTRODUCTION    
      CLASSIFICATIONS OF SLEEPERS    
      DESIGN CONSIDERATION FOR PRESTRESSED CONCRETE SLEEPERS    
      USES AND APPLICATION    
      B.I.S. SPECIFICATION    
      RAW MATERIALS    
      REVERSE BEND TEST    
      CONSTIUENTS OF CONCRETE    
      GENERAL PRINCIPLES OF MIX DESIGNS    
      DESIGN OF HIGH STRENGTH CONCRETE    
      REQUIREMENTS FOR PLAIN AND REINFORCED CONCRETE EXPOSED
         TO SULPHATE ATTACK    
      MINIMUM CEMENT CONTENT REQUIRED IN CEMENT CONCRETE TO ENSURE DURABILITY UNDER SPECIFIED CONDITIONS OF EXPOSURE FOR
         PRESTRESSED CONCRETE    
      MODERN DEVELOPMENTS IN THE DESIGN & CONSTRUCTION ASPECTS    
      DESIGN CONSIDERATIONS FOR PCC SLEEPERS    
      SALIENT FEATURES OF PCC SLEEPERS    
      SLEEPER DENSITY    
      MARKET SURVEY    
      PRESENT MANUFACTURERS OF PRESTRESSED CONCRETE RAILWAY SLEEPERS    
      PROCESS WISE EQUIPMENT DESCRIPTIONS    
      PRESTRESSING APPARATUS    
      APPARATUS FOR TESTING    
      METHODS OF MANUFACTURE AND TESTS FOR ACCEPTANCE    
      MANUFACTURING PROCESS    
      TESTING ARRANGEMENT FOR STATIC BENING STRENGTH TEST
        FOR PRESTRESSED MONOBLOCK CONCRETE SLEEPERS FOR BG AND MG    
      DETAILED PROCESS OF PRESTRESSED RAILWAY CONCRETE SLEEPERS    
      PROCESS FLOW DIAGRAM    
      PLANT LAYOUT    
      SUPPLIERS OF RAW MATERIALS    
      SUPPLIERS OF PLANT & MACHINERY (GLOBAL)    
      SUPPLIERS OF PLANT & MACHINERY    
      PROJECT ECONOMICS    
      BASIS FOR RAW MATERIAL COMPUTATIONS    
                          

      APPENDIX – A :

       1.      COST OF PLANT ECONOMICS      
       2.      LAND & BUILDING                                      
       3.      PLANT AND MACHINERY                                  
       4.      FIXED CAPITAL INVESTMENT                             
       5.      RAW MATERIAL                                         
       6.      SALARY AND WAGES                                     
       7.      UTILITIES AND OVERHEADS                              
       8.      TOTAL WORKING CAPITAL                                
       9.      COST OF PRODUCTION                                   
      10.      PROFITABILITY ANALYSIS                               
      11.      BREAK EVEN POINT                                     
      12.      RESOURCES OF FINANCE                           
      13.      INTEREST CHART                                       
      14.      DEPRECIATION CHART                                   
      15.      CASH FLOW STATEMENT                                   
      16.      PROJECTED BALANCE SHEET          
       

      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution