Menu
Your Cart

    Detailed Project Report on railway wagon manufacturing

    Detailed Project Report on railway wagon manufacturing
    Detailed Project Report on railway wagon manufacturing
    ₹ 0 INR
      Why Choose Us
      • More than 40 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.


      RAILWAY WAGON MANUFACTURING [3581]

      TYPES OF WAGON:- (1) COVERED WAGON: Covered wagon is a wagon characterized by its closed construction (solid sides all the way up and roof) and by the safety it provides for the goods conveyed in it (possibility of padlocking and sealing). Closed Type Freight Wagons for transportation of all classes of General Goods, Food Grains, Bagged Cement etc. CONSTRUCTION OF COVERED WAGON:- A. SIDES: Sides are made up of side panels and side stanchions, which are attached to the underframe by crib angles/riveting strips /welding strips. They include top copings, doors, door fittings, label holders, rain protection angles above swing doors, door striking plates and anti bleeding device below the flap doors. B. ENDS: Ends are similar in construction to sides in that they consist of end panels, end stanchions, top copings and in some cases, intermediate copings. Attachment to the underframe is by means of end floor angles and through the stanchions. Covered wagons are provided with ventilators at the upper end of body ends. Corner stanchions connect the ends with the sides. C. ROOF: Roofs of covered wagons consist of roof sheets and carlines. Roof sheets are much thinner than the sheets used for the body sides and end panels. D. DOOR: Each side of the wagon is provided with door for manual unloading. The doors consist of swing doors at the top with label holder hinged to the angles on the sides and flap doors at the bottom, hinged at the bottom with Anti bleeding device.

      COST ESTIMATION

      Plant Capacity                           12 Nos/Day  
      Land & Building (80000 sq.mt)     Rs. 57.04 Cr
      Plant & Machinery                    Rs. 85.81 Cr
      Working Capital for 2 Months   Rs. 97.06 Cr
      Total Capital Investment          Rs. 243.15 Cr
      Rate of Return                         16%
      Break Even Point                     65%


      INTRODUCTION    
      (1) ACCORDING TO IT’S UNDER GEAR    
      (2) ACCORDING TO ITS UTILITY    
      TYPES OF WAGON    
      (1) COVERED WAGON    
      CONSTRUCTION OF COVERED WAGON    
      A. SIDES    
      B. ENDS    
      C. ROOF    
      D. DOOR    
      CLOSED TYPE – BCN, BCNA, BCNAHS, BCNHL    
      BCN    
      BCNA    
      BCNA-HS    
      BCCN/BCCNA/BCCNB    
      BCCN    
      (2) OPEN WAGON    
      A. SIDES    
      B. ENDS    
      C. DOORS    
      BOXN WAGON –    
      BOXNHA    
      BOXNHS    
      BOXN CR    
      BOXNLW    
      BOXNHL    
      (3) FLAT WAGON    
      CONSTRUCTION OF FLAT WAGON    
      A. ENDS    
      B. SIDE STANCHION    
      FLAT TYPE –    
      (4) TANK WAGON    
      TANK TYPE –    
      B.I.S. SPECIFICATION    
      PROCESS FLOW CHART    
      MANUFACTURING PROCESS FOR BOXNHL WAGON    
      DESCRIPTION ABOUT BOXHNL WAGON    
      DETAILS SALIENT FEATURES OF BOXNHL WAGON    
      3. BOGIE:-    
      4. BRAKE GEAR:-    
      5. RUNNING GEAR:-    
      STANDARD FEATURES OF ‘BOXNHL’ WAGON    
      (1) UNDER FRAME:    
      MAIN PARTS OF UNDERFRAME ARE:-
      (2) CENTER SILL:    
      (3) SIDE BODY:    
      (4) END BODY:    
      (5) DOORS:    
      (6) BOGIE:    
      BOXHNL WAGON HAS CAS NUB BOGIE    
      FIGURE  BOGIE GENERAL ARRANGEMENT FOR CASNUB    
      FIGURE  BOGIE GENERAL ARRANGEMENT CASNUB    
      7. CENTRE BUFFER COUPLER    
      ADVANTAGES OF CBC:-    
      COUPLER BODY:    
      KNUCKLE:    
      (8) BRAKE SYSTEM    
      AIR BRAKE SYSTEM:    
      A) DISTRIBUTOR VALVE:    
      B) BRAKE CYLINDER:    
      C) CUT OFF ANGLE COCK:    
      D) DIRT COLLECTOR:    
      E) RESERVOIR:    
      F) METAL PIPES AND JOINTS:    
      G) SLACK ADJUSTER:    
      MAIN STEPS FOR FABRICATION    
      MAIN PROCESS    
      THE MAIN PROCESS HAS FOLLOWING STEPS ARE GIVEN BELOW    
      (1) CUTTING    
      (A). GUILLOTINING    
      THE FOLLOWING GUILLOTINE CLEARANCE SETTINGS ARE GIVEN
         FOR GUIDANCE:-    
      (B) PLASMA CUTTING    
      (A) PLASMA CUTTING:-    
      (B) CNC PLASMA CUTTING:-    
      CUTTING GASES    
      (C) ABRASIVE CUT – OFF WHEELS    
      (D) ARC-AIR GOUGING    
      (E) POWDER CUTTING    
      (F) SLITTING    
      (G) COLD SAWING    
      (H) BLANKING AND PUNCHING    
      (I) DRILLING    
      (2) STRAGHTENING    
      STRAIGHTENING OF IRSM-44:    
      (3) PRESSING    
      (A) HYDRAULIC PRESS:-    
      (B) POWER HAMMER:-    
      (C) DROP HAMMER:-    
      (4) WELDING    
      (A) ARC WELDING:-    
      ARC WELDING CIRCUIT:-    
      DEFETS OF ARC WELDING:-    
      1. OVERLAP:-    
      2. UNDERCUT:-    
      3. POROSITY:-    
      4. SPATTER:-    
      5. CRATER:-    
      (B) GAS METAL ARC WELDING (GMAW)/MIG:-    
      DEFECTS OF MIG WELDING:-    
      1. OVERLAP:-    
      2. UNDERCUT:-    
      3. POROSITY:-    
      4. SPATTER:-    
      5. CRATER:-    
      IN A WAGON, VARIOUS PARTS ARE WELDED AS PRESCRIBED FOLLOWING
      WELDING OF IRS  M-44    
      (A) WELDING PROCESS    
      (B) WELD REPAIRS    
      (C) POST WELD CLEANING    
      (D) MECHANICAL CLEANING    
      (E) WELDING PROCEDURE:-    
      GENERAL PRECAUTIONS IN WELDING OF STAINLESS STEEL    
      WELDABILITY ISSUES:    
      PRECAUTIONS DURING WELDING:    
      PRECAUTIONS AFTER WELDING:    
      QUALITY REQUIREMENTS OF WELDING –    
      FABRICATION OF DIFFERENT PARTS    
      (1) CENTER SILL    
      3 FINISHED CENTER SILL SET    
      Z-SECTION    
      CENTER PART OF CENTRE SILL    
      END PART OF CENTRE SILL    
      FIXTURE OF CENTRE SILL    
      (2) UNDERFRAME    
      UNDER FRAME STRUCTURE    
      (3) BODY END    
      BODY END WITH VENTILATOR AND PRESSINGS    
      FIXTURE OF BODY END    
      (4) BODY SIDE    
      BODY SIDE FIXTURE    
      BODY SIDE    
      (5) DOORS    
      DOORS    
      (7) BRAKING SYSTEM    
      SLACK ADJUSTER     AUXILIARY RESERVOIR    
      DISTRIBUTOR VALVE AND CONTROL BRAKE CYLINDER    
      LEVER ASSEMBLY PARTS   EMPTY LOAD ADJUSTER    
      SHOE BRAKES    
      BRAKING PROCESS:-    
      (6) FINAL ASSEMBLY    
      PROCEDURE:-    
      A) REMOVAL:-    
      B) INSTALLATION:-    
      GENERAL DATA:-    
      (7) FINISHING (SHOT BLASTING)    
      (A) SURFACE PREPARATION    
      SHOT BLASTING CHAMBER    
      (B) PAINTING OF WAGON BODY AND UNSER FRAME    
      FOR STAINLESS STEEL    
      PRECAUTIONS TO BE TAKEN IN WORK AREA    
      PRECAUTIONS TO BE TAKEN IN STORAGE    
      PRECAUTIONS TO BE TAKEN IN STORAGE OF IRS: M 44 STEELS    
      (8) TESTING    
      (1) RADIOGRAPHY TEST (RT):-    
      (2) DI-PENETRATION TEST:-    
      (3) COMPRESSIVE STRENGTH TEST:-    
      SETUP FOR TEST    
      LOAD PROVIDING MACHINE    
      (4) WATER TESTING:-    
      WATER TESTING UNIT    
      (6) VISUAL INSPECTION:-    
      (7) BRAKING SYSTEM TEST:-    
      PRESSURE GENERATING UNIT    
      MARKET POSITION    
      FREIGHT CAN SPEED UP ECONOMIC GROWTH    
      SUPPLY CONSTRAINTS HIT INDIAN RAILWAYS’ INDUCTION
         OF FREIGHT WAGONS    
      RAILWAY MINISTER SAYS INDIA FACING SHORTAGE OF WAGONS    
      INDIAN RAILWAYS INTENDS TO PURCHASE 38,000 WAGONS    
      SUPPLY CONSTRAINTS HIT INDIAN RAILWAYS’ INDUCTION OF FREIGHT WAGONS    
      RAILWAYS MULLS BUYING NEW WAGONS WORTH RS 9,000 CRORE
          IN 3 YEARS    
      PLANT LAYOUT    
      MANUFACTURERS/SUPPLIERS OF RAILWAY WAGON    
      SUPPLIERS OF RAW MATERIALS    
      SUPPLIERS OF IRS M-44 SS SHEET    
      SUPPLIERS OF CRF SECTION    
      SUPPLIERS OF COMPLETE CAS NUB BOGIE ASSEMBLY    
      SUPPLIERS OF AIR BRAKE ASSEMBLY    
      SUPPLIERS OF WELDING ELECTRODES
      SUPPLIERS OF PAINS MATERIALS    
      SUPPLIERS OF PLANT AND EQUIPMENTS    
      POWER PRESS    
      SHEARING MACHINE    
      ROLLING MACHINE    
      FLYPRESS    
      BENDING MACHINE    
      MECHANICAL PRESS    
      FORGING PRESSES    
      FORGING HAMMER    
      UNCOILING MACHINE    
      SHEET LAVELING MACHINE    
      PUNCHING PRESS    
      CNC PLASMA CUTTING MACHINE    
      MILLING MACHINE    
      CNC LATHE MACHINE    
      BOARING MACHINE    
      POWER HACKSAW    
      GRINDING MACHINE    
      PROJECTION WELDER    
      SEAM WELDING MACHINE    
      SPOT WELDING MACHINE    
      GAS WELDING EQUIPMENTS    
      MIG WELDING MACHINE    
      SUPPLIERS OF DRILLING, LATHE,TAPING MACHINES    
      EOT CRANE    
      POWER TRANSFORMER    
      ELECTRICAL PANEL    
      ELECTRIC MOTOR    
      COOLING TOWER    
      EFFULENT TREATMENT PLANT    
      AIR POLLUTION CONTROL EQUIPMENTS    
      AIR CONDITIONING EQUIPMENTS    
      AIR COMPRESSORS    160
      PLATFORM WEIGHING MACHINE    
      MATERIAL HANDLING EQUIPMENTS    
      FIRE FIGHTING EQUIPMENTS    
      SHOT BLASTING MACHINE    
      JIGS AND FIXTURE    
      SUBMERSIBLE WATER PUMP    


      APPENDIX – A:

      01.    PLANT ECONOMICS    
      02.    LAND & BUILDING     
      03.    PLANT AND MACHINERY    
      04.    OTHER FIXED ASSESTS    
      05.    FIXED CAPITAL    
      06.    RAW MATERIAL    
      07.    SALARY AND WAGES    
      08.    UTILITIES AND OVERHEADS
      09.    TOTAL WORKING CAPITAL    
      10.    TOTAL CAPITAL INVESTMENT    
      11.    COST OF PRODUCTION    
      12.    TURN OVER/ANNUM    
      13.    BREAK EVEN POINT     
      14.    RESOURCES FOR FINANCE    
      15.    INSTALMENT PAYABLE IN 5 YEARS    
      16.    DEPRECIATION CHART FOR 5 YEARS    
      17.    PROFIT ANALYSIS FOR 5 YEARS    
      18.    PROJECTED BALANCE SHEET FOR (5 YEARS)    
       

      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution